Dutch Bangla Power & Associates Ltd.

  • Dutch Bangla Power & Associates Ltd.

  • Dutch Bangla Power & Associates Ltd.

  • Dutch Bangla Power & Associates Ltd.

  • Dutch Bangla Power & Associates Ltd.

Project Details : Dutch Bangla Power & Associates Ltd.

About us

Name of the Company : Dutch Bangla Power & Associates Ltd.
Owner of this Company : Mohammad Obaidul Karim
MD of this Company : Salman Obaidul Karim
Date of Installation : July 21, 2011
Number of employees : 125 (Including operation and maintenance)

Major Equipment & installment:

  • Engine : 12 Nos. Model: W20V32 from Wartsila Finland
  • Alternator : 12 Nos. Model DIG 167 f/8 from AVK Germany
  • Starting Compressor : 02 Nos, Model 160L, Hatlapa, Germany
  • Ins Air Compressor : 02 Nos. Model SK25, Kaeser
  • EGB : 04 Nos. Alborg
  • Aux Boiler : 01 No. Alborg
  • BSU : 01 nos. 375 KVA
  • Fuel Purifier : 03 Nos. Model OSE 80, Westfalia, Germany
  • LO Separator : 12 Nos. Model OSE 20, Westflia, Germany
  • Firefighting equipment : 01 Nos.
  • ETP : 01 Nos.
  • Storage Tank : 02 Nos. Capacity 4000 CM each
  • Day Tank : 01 Nos. Capacity 200 CM
  • Buffer Tank : 01 Nos. Capacity 100 CM

Alternator Principle:

A.C. generators or alternators (as they are usually called) operate on the same fundamental principles of electromagnetic induction as D.C. generators.

Alternating voltage may be generated by rotating a coil in the magnetic field or by rotating a magnetic field within a stationary coil. The value of the voltage generated depends on-

  • the number of turns in the coil.
  • strength of the field.
  • the speed at which the coil or magnetic field rotates.
Switch Yard:

We have a switch yard of capacity 150 MVA, 11kv to 132 KV. There are 3 transformer having capacity 40/50 MVA from Comtom Greaves (CG). Our 11 KV line is connected with each transformer incoming terminal through switch gear, it is then step up to 132 KV which is connected to the national grid through isolator and breaker. It is under Shidhiriganj Grid.

ETP:

We have a built-in ETP system, All rejected oily water accumulated in the oily water sludge tank then through oily water separator pure water drain in the rain pit and sludge accumulated in the sludge tank. This sludge is then taken away by the vendor who have the license from environment.

Fire fighting System:

We have our own fire fighting system by which we can fight 6 hours continuously. The whole are is covered with fire alarm and smoke detector. We have 2 types of fire fighting system,

  • Extinguisher Type
  • Fire hydrant

Extinguisher: We have different type of extinguisher such as CO2, Foam. 45 sets of CO2 is located in different places and 3 Foam extinguisher also.

Fire hydrant: we have self fire hydrant system of capacity 700 CM. We have 3 types of pumps for firefighting like diesel driven pump, electrical driven pump and jockey pump. We have a huge no of hydrant in different location which covers the whole area.

Safety and Security:

For safety and security of the plant we have 3 types' security forces

  • Arm force battalion, Ansar - 22 Persons
  • Orion Security - 10 Persons
  • Hired security force-Elite Force - 16 Persons

They always keep watching the whole plant to maintain the safety and security of the plant.

Plant Facility:

For safety and security of the plant we have 3 types' security forces

  • Workshop with well equipped to handle the power plant maintenance.
  • Laboratory with well equipped to meet the power plant requirements.
  • Well decorated Warehouse.
  • Comfortable accommodation.
  • First Aid
  • PPE
  • Canteen facilities
  • Welfare
  • Transport facilities
  • Fire fighting's

They always keep watching the whole plant to maintain the safety and security of the plant.

We have a cleaning agency:
  • SATCO : 21 persons
For the employee we have following PPE.
  • Safety shoe
  • Helmet
  • Ear muff
  • Safety glass
  • Working dress
  • Hand gloves
We have well equipped fire fighting system.

Employee's Welfare

  • We have welfare fund for the employee.
  • We have medical facility.
  • We have Insurance.
  • We are supporting the employ who are affected by flood.
We have well equipped fire fighting system.

Employee's Medical Services

  • We have medical facility.
  • Emergency treatment.
  • First Aid Box.
  • Insurance.
Conclusion:

Every day we are producing electricity as per the requirement of NLDC, BPDB and from last 3 years we running this project successfully with maintaining all rules and regulation. In previous 3 years we don't have any lost time injury and incident. It is an idle plant in all respect.